TierPoint – BWI

813 Pinnacle Drive
Linthicum Heights, MD
21090 USA

Overview

Premier quality, 2N capacity available in a secured setting at one of TierPoint's newest data centers. 500 kW of capacity immediately available with the ability to add another 2.5 MW. Unique direct connect options to hyperscalers in Ashburn. Purpose-built capacity available with the following features:

  • Dual power feeds to the building with 2N UPS and generators
  • Built-in carriers include CenturyLink, Cogent, Comcast, Crown Castle, Fibertech, Verizon, XO, and Zayo
  • Audited under SSAE 18 SOC 2 Type II, PCI-DSS*, GLBA and HIPAA standards annually and is ITAR and EU-US Privacy Shield registered

Property Details

General

Building TypePurpose Built
Year Converted/Renovated2018
Stand Alone or Data Center CampusStand Alone

Location

Wind Rating of Roof185 MPH
Wind Rating of Structure185 MPH

Power

Estimated All-In Utility Rate$0.1000
UPS Redundancy2N
UPS Unit Capacity0.5 MW
Target UPS Battery Capacity at Full Load7.5 Minutes
PDU Redundancy2N
Generator Redundancy2N
Generator Capacity1.25 MW
Generator Run Time at Full Load2 day Minimum
Backup Fuel ProviderYes
Utility Service ProviderBGE

Telecommunications

Carrier NeutralYes
Meet Me Rooms1
Provider/Landlord Control Meet Me Rooms?Yes
Number of Carriers8
Number of Carriers within 100 meters1
Fiber ProvidersCenturyLink, Cogent, Comcast, Crown Castle, Fibertech, Verizon, XO, Zayo
Multiple Diverse Fiber Entrances?Yes

Electrical/Mechanical

Maximum Rack Density25 kW/rack
Density150 Watts/SF
Mechanical Systems Concurrently Maintainable?Yes
Design PUE1.35
Current Average Annual PUE1.8

Cooling

Water or Air Cooled Mechanical SystemAir Cooled
Aggregate Cooling Capacity280 tons
Configuration of Outdoor Heat Exchange ComponentsN+1
Configuration of Indoor Heat Exchange ComponentsN+1
Configuration of Medium Between Indoor and Outdoor ComponentsN+1

Landlord

Remote Hands Available through Landlord?Yes
Cloud Services Available through Landlord?Yes

Fire Protection

Security

Authentication Methods - Data CenterBadge and Iris reader
Authentication Methods - FacilitySign in, Identity check with valid government issued ID