Digital Realty – 350 E. Cermak

350 E. Cermak
Chicago, IL
60616 USA

Overview

Since 2006, this data center facility has provided access to more than 40 of the leading domestic and international carriers and physical connection points of the world's telecommunications networks and Internet backbones.

Located in the South Loop of the Chicago Central Business District, 350 E. Cermak is the premier mission critical interconnection, colocation and telecommunications facility in the Midwest. The facility offers access to the CME/LNET Exchanges, direct access to SFTI Network and other carriers via fiber to the other suites within the building.

The industrial-strength infrastructure includes four fiber vaults and three electric power feeds, which provide the building with more than 100 megawatts of power. The 350 East Cermak location is currently the second-largest power customer for Commonwealth Edison, trailing only Chicago's O'Hare Airport. Grid power is supported by more than 50 generators throughout the building, which are fueled by multiple 30,000 gallon tanks of diesel fuel.

Property Details

General

Building TypeRetrofit
Year Built1912
Year Converted/Renovated1999
Existing Provider Lease?No
Stand Alone or Data Center CampusStand Alone
Number of Floors8
Floor Load250 lbs/SF
Roof CenterMembrane and Reinforced Concrete Decking
ParkingAvailable
Parking Spaces20

Location

Seismic ZoneZone 0
Hurricane RiskNo
Flood ZoneZone X (unshaded), outside 500 year flood plain
Proximity to Coastline3 miles
Proximity to Water Tower4 miles
Proximity to River1 miles
Proximity to Distribution/Storage of Propane5 miles
Proximity to Hazardous Materials Sites3 miles
Within a High Crime AreaNo
Within close proximity to a Police StationYes
Within close proximity to a Fire StationYes
Within close proximity to a HospitalYes
Within close proximity to a VolcanoNo
Proximity to Fault Line179 miles
Proximity to Chemical Plant19 miles
Proximity to Research Lab26 miles
Proximity to Military Base17 miles
Proximity to Nuclear Plant60 miles
Proximity to Munitions Plant185 miles
Proximity to Rail0.1 miles
Closest Highway Intersection1 miles
Miles To Nearest Airport9 miles
Nearest AirportMidway International Airport

Power

Estimated All-In Utility Rate$0.066
Utility Power100 MW
UPS Redundancy2N
UPS Unit Capacity0.6 MW
Target UPS Battery Capacity at Full Load5 minutes
PDU Redundancy2N
PDU MeteringYes
Generator RedundancyN+1
Generator Capacity2 MW
Generator Run Time at Full Load24 hours
Backup Fuel ProviderAgreements with 3 local suppliers with emergency response delivery times, if necessary
Switchgear is Open or ClosedOpen
Utility Service ProviderComEd
Number of Utility Feeds13
Substation Service13 different utility feeds from three diverse underground substations.
Mark-Up on Cost of Utility Power?No

Telecommunications

Carrier NeutralYes
Meet Me RoomsYes
Provider/Landlord Control Meet Me Rooms?Provider
Number of Carriers40
Carriers Make Way Onto Property Via Diverse Paths?Yes
Fiber ProvidersBCE Nexxia, BT America, Centuryink, CFN, Cogent, Colt Internet, Comcast, Comcast IP, Cox, Deutsche Telekom, Fiberlight Hibernia, Hurricane Electric, IPC Networks, Level3, Lighttower, Verizon, NexGen, Orange Business, Rogers Cable, Savvis, Sunesys, Tata Comm, Us Signal, Windstream, Xo, Zayo. Intercontinental Exchange, HHA Exchange.
Multiple Diverse Fiber Entrances?Yes

Electrical/Mechanical

Average Rack Density5 kW/rack
Maximum Rack Density20 kW/rack
Density125 Watts/SF
Mechanical Systems Concurrently Maintainable?Yes
Design PUE1.6

Cooling

Water or Air Cooled Mechanical SystemWater
Aggregate Cooling Capacity50 tons
Configuration of Outdoor Heat Exchange Components2N
Configuration of Indoor Heat Exchange Components2N
Configuration of Medium Between Indoor and Outdoor Components2N
Redundancy of Air Handling System - Data CenterN+2
Redundancy of Air Handling System - Battery / UPSN+2

Fire Protection

Method of Fire Detection in Data Center AreaHigh sensitivity detectors (ionization and photoelectric combination) under floor and under ceiling.
Method of Fire Suppression in Data Center AreaDry Pipe, Pre-action
Method of Fire Detection in Support/Common AreaTraditional Smoke Detection
Method of Fire Suppression in Support/Common AreaWet Pipe

Security

Certifications Required for Landlord or TenantsSOC 2 + PCI-DSS
Access GatesNo
Authentication Methods - Data CenterBiometric and Photo Badge Access
Authentication Methods - FacilityAccess Reader, Biometric
Facility PerimeterNo
On-Site SecurityYes