Digital Realty – 105 Cabot Street

105 Cabot Street
Needham, MA
2494 USA

Overview

105 Cabot Street is the second mission critical building of the Digital Realty Needham data center campus. This three-story, purpose-built data center facility totals 130,000 sq. ft. containing approximately 40,000 sq. ft. of raised floor. With over 10 MW of redundant utility power, this highly energy efficient building is designed to be concurrently maintainable for all key infrastructure components.

Property Details

General

Building TypePurpose Built
Year Built2013
Existing Provider Lease?No
Building ConstructionFacility is Steel Frame with Precast Concrete and EPDM Roof
Stand Alone or Data Center CampusData Center Campus
Number of Floors3
ParkingAvailable
Parking Spaces45

Location

Seismic ZoneZone 2A
Proximity to Coastline9 miles
Proximity to River0.5 miles
Within a High Crime AreaNo
Within close proximity to a Police StationYes
Within close proximity to a Fire StationYes
Within close proximity to a HospitalYes
Within close proximity to a VolcanoNo
Proximity to Foreign Embassies17 miles
Proximity to Dam1 miles
Proximity to Military Base10 miles
Proximity to Defense Plant10 miles
Proximity to Nuclear Plant41 miles
Proximity to Rail0.5 miles
Closest Highway Intersection0.25 miles
Miles To Nearest Airport19 miles
Nearest AirportLogan International Airport

Power

Estimated All-In Utility Rate$0.12
Utility Power10 MW
UPS Redundancy2N
UPS Unit Capacity0.625 MW
Target UPS Battery Capacity at Full Load6 minutes
PDU Redundancy2N
PDU MeteringYes
Generator RedundancyN+1
Generator Capacity2 MW
Generator Run Time at Full Load24 hours
Utility Service ProviderNSTAR
Number of Utility Feeds2
Mark-Up on Cost of Utility Power?No

Telecommunications

Carrier NeutralYes
Meet Me RoomsYes
Provider/Landlord Control Meet Me Rooms?Provider
Monthly Recurring Cost of Fiber Cross Connects$370
Monthly Recurring Cost of Copper Cross Connects$290
Number of Carriers12
Carriers Make Way Onto Property Via Diverse Paths?Yes
Fiber ProvidersVerizon, RCN, Sidera, Comcast, Zayo, Lightower, Level 3, AT&T, XO, Reliance Globalcom, and Netriplex
Multiple Diverse Fiber Entrances?Yes

Electrical/Mechanical

Average Rack Density5 kW/SF
Maximum Rack Density12 kW/SF
Density150 Watts/SF
Mechanical Systems Concurrently Maintainable?Yes
Design PUE1.2
Current Average Annual PUE1.24

Cooling

Water or Air Cooled Mechanical SystemAir
Aggregate Cooling Capacity800 tons
Configuration of Outdoor Heat Exchange Components2N
Configuration of Indoor Heat Exchange ComponentsN+1
Configuration of Medium Between Indoor and Outdoor ComponentsN+1
Redundancy of Air Handling System - Data CenterN+2
Redundancy of Air Handling System - Battery / UPSN+1

Fire Protection

Method of Fire Detection in Data Center AreaPhotoelectric and ionization smoke detectors at the ceiling & below raised floor
Method of Fire Suppression in Data Center AreaDouble interlock dry pipe pre-action
Method of Fire Detection in Support/Common AreaPhotoelectric and ionization smoke detectors at the ceiling & below raised floor
Method of Fire Suppression in Support/Common AreaSingle action water based system

Security

Certifications Required for Landlord or TenantsSOC 2 with PCI attestation
Authentication Methods - Data CenterDual Factor Biometric Authentication
Authentication Methods - FacilityFacility has 2 card reader doors at entrance to main lobby, followed by security guard booth. Entrance beyond lobby is via turnstile with card reader.
On-Site SecurityYes